Description: Fire alarm verification for West Village Towers in Calgary, tied to motherboard replacement for nodes within the existing system. Email correspondence also references Revenue 2022/2023/2024 / Invitation: -DAV @ Fri Feb 7, 2025 8am – 4pm (MST) (Tim Alton).
Problem/Objective: Verify the fire alarm system after motherboard replacement work. The email thread suggests the immediate objective was to review and issue the required drawing or submittal updates.
Method/Process: Performed on-site verification and reviewed the installed system for conformance with the referenced standards. The correspondence shows drawing review, revision tracking, and submittal coordination.
Result/Impact: Confirmed the system was operational at the time of verification. The thread points to delivery or issuance of the required documents.
Reflection: MNA learned from West Village Towers that residential settings need careful coordination between life-safety intent, occupant continuity, and clear closeout documentation; the project reinforced the value of turning limited source information into clear decisions, coordinated documentation, and practical next steps for the client.
Location: 850 11 St SW, Calgary, AB
Date: 2025-02-07