Description: Mechanical/HVAC engineering support based on project drawings and submittal documentation.
Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.
Result/Impact: Delivered mechanical engineering review for the documented scope, supporting permit, construction, or closeout requirements.
Reflection: MNA learned from Cannabis #500 3605 29 STREET NE (Indigro Organics) that mechanical consulting at 800 Macleod Trail SE Calgary AB T2G 2M3 Postal Code Re: Design and Field Review of Construction for the following works best when equipment capacity, ventilation paths, and site constraints are reconciled early; that upfront coordination makes the final design easier to permit, build, and maintain.
Location: 3605 29 Street NE, #500, Calgary, AB
Date: 8/6/2019