Springbank FAV

Springbank FAV

Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: 1 horn strobe and load test

Problem/Objective: The project required practical engineering support for a group d, business and personal services occupancies while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Springbank FAV that focused fire alarm verification at of: 128 MacLaurin Dr, Calgary, AB T3Z 3S4 for the depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 128 MacLaurin Dr, Calgary, AB T3Z 3S4

Date: 8/11/2017

Scroll to Top