
Description: Fire alarm verification and code-compliance review based on project submittal documentation.
Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.
Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.
Reflection: MNA learned from 2012, 101 Highland Park CM Airdrie that focused fire alarm verification at 2012, 101 HIGHLAND PARK COMMON NE, AIRDRIE, AB DRAWING TITLECOVER PAGE SCALE NTS depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: 2012, 101 Highland Park Common NE, Airdrie, AB
Date: 2017-07-01