Description: Fire protection and sprinkler system engineering support based on project submittal documentation.
Problem/Objective: The project required practical engineering support for a group d, business and personal services occupancies while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.
Result/Impact: Confirmed the fire suppression scope was reviewed against the project requirements and documented for permit, closeout, or compliance use.
Reflection: MNA learned from Tecina Walls that code and life-safety work should not rely on weak OCR fragments as location evidence; the project reinforced the need to keep unsupported address fields blank until a source-supported site can be confirmed.
Location: Bay 5, 235126 Ryan Road, Rocky View, AB
Date: 8/11/2020