Description: Fire protection and sprinkler system engineering support based on project submittal documentation.
Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.
Result/Impact: Confirmed the fire suppression scope was reviewed against the project requirements and documented for permit, closeout, or compliance use.
Reflection: MNA learned from Savana Daycare MR&ER that sprinkler and fire protection scopes need early coordination between layout assumptions, hazard classification, and constructability, because small documentation gaps can quickly affect approvals, installation, and closeout.
Location: 305-315, 681 Savanna Blvd NE, Calgary, AB
Date: 7/1/2024