Rockyview Professional Building

Rockyview Professional Building

Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: Addition of 2 Horn Strobes in Office area on 2nd Floor

Problem/Objective: Complete of: Addition of 2 Horn Strobes in Office area on 2nd Floor.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Rockyview Professional Building that focused fire alarm verification at of: #220 1011 Glenmore trail SW for the depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: #220 1011 Glenmore trail SW

Date: 12/11/2020

Scroll to Top