Rocky Mountain Cadet Training Camp FACP Replacement

Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: New Addressable F/A panel + Devices

Problem/Objective: Complete of: New Addressable F/A panel + Devices.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Rocky Mountain Cadet Training Camp FACP Replacement that focused fire alarm verification at 17 the fire alarm system was reviewed for conformance with dr depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: Bighorn No. 8, AB

Date: 5/17/2019

Scroll to Top