Regal Manor

Regal Manor

Description: Fire alarm verification and code-compliance review based on project submittal documentation.

Problem/Objective: The project required practical engineering support for a group b, division 3, care occupancies without treatment while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Regal Manor that focused fire alarm verification at of: 819 4A Street NE Calgary AB T2E 3T1 for the depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 819 4A Street NE Calgary AB T2E 3T1

Date: 6/10/2019

Scroll to Top