
Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: Add 6 new fire alarm relays for Delta V system (alarm and trouble), in control building, PGH building, and UV building
Problem/Objective: Complete of: Add 6 new fire alarm relays for Delta V system (alarm and trouble), in control building, PGH building, and UV building.
Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.
Result/Impact: Confirmed the fire alarm relay scope for the Pine Creek WWTP ACWA/control-related buildings could be supported with documented verification evidence.
Reflection: MNA learned from Pine Creek WWTP ACWA Building that focused fire alarm verification depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: 3131 210 Ave SE, Calgary, AB T3M 2L9, Canada
Date: 4/18/2022