Perma Deck, Hat EV, ITC Underwoods structural inspection

Perma Deck, Hat EV, ITC Underwoods structural inspection

Description: Mechanical/HVAC engineering support based on project drawings and submittal documentation.

Problem/Objective: The project required practical engineering support for a group b, division 3, care occupancies without treatment while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.

Result/Impact: Delivered mechanical engineering review for the documented scope, supporting permit, construction, or closeout requirements.

Reflection: MNA learned from Perma Deck, Hat EV, ITC Underwoods structural inspection that mechanical consulting at 20 Reviewed only as to the effect on the base st works best when equipment capacity, ventilation paths, and site constraints are reconciled early; that upfront coordination makes the final design easier to permit, build, and maintain.

Location: 611 7th Ave SE, Calgary, AB

Date: 12/20/2018

Scroll to Top