Optima Manufacturing

Optima Manufacturing

Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: fire alarm verification

Problem/Objective: The project required practical engineering support for a group f, division 2, medium-hazard industrial occupancies while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Optima Manufacturing that focused fire alarm verification at of: 2480 Pegasus Rd NE, Calgary, AB T2E 8G8 for the depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 2480 Pegasus Rd NE, Calgary, AB T2E 8G8

Date: 5/8/2020

Scroll to Top