Kings Point Dental

Kings Point Dental

Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: 5 horn strobes, verification, load test

Problem/Objective: Complete of: 5 horn strobes, verification, load test.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Kings Point Dental that focused fire alarm verification at 28 Kingsview Road depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 28 Kingsview Road

Date: 3/6/2020