King Palace Strathmore Kitchen Suppression

King Palace Strathmore Kitchen Suppression

Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: Kitchen Hood

Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from King Palace Strathmore Kitchen Suppression that focused fire alarm verification at 102 320 2 St. St depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 102 320 2 St. St

Date: 4/2/2019

Scroll to Top