
Description: Sprinkler system design compliance review for the IKO C3 and C4 warehouse in Calgary, focused on racking and storage protection requirements. Email correspondence also references Sprinkler Verification Letter for IKO C4 / IKO C4 Sprinkler Project Hydraulic Calcs.
Problem/Objective: Verify sprinkler system design suitability for the warehouse storage and racking configuration.
Method/Process: Reviewed as-built drawings and performed a physical site inspection against storage criteria and fire protection design requirements.
Result/Impact: Confirmed the sprinkler system could support the defined storage arrangement and design intent at the time of review.
Reflection: MNA learned from IKO C3 & C4 Sprinkler that focused fire alarm verification at 1600 42 Avenue SE, Calgary, AB T2G 5B5 depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: 1600 42 Avenue SE, Calgary, AB T2G 5B5
Date: 4/1/2025