
Description: Fire alarm verification and code-compliance review based on project submittal documentation.
Problem/Objective: The project required practical engineering support for a group d, business and personal services occupancies while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.
Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.
Reflection: MNA learned from Hillcrest Storage Area (M&E) that unsupported OCR fragments should not be carried as project addresses; mechanical/electrical scopes need clean source-backed site data before downstream photo matching or review.
Location: 1512 8 Ave NW, Calgary, AB T2N 1C1
Date: 2/15/2021