
Description: Hankki Cochrane was a electrical consulting assignment for APX for a group a, division 2, assembly occupancies not elsewhere classified in group a in the project site. The work focused on turning available project information into a clear, coordinated engineering deliverable that could support review, permitting, construction, or closeout needs.
Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.
Result/Impact: Delivered electrical engineering review for the documented scope, supporting permit, construction, or closeout requirements.
Reflection: MNA learned from Hankki Cochrane that electrical consulting at 1 2x 1 PROVIDE POWER FOR SIGNAGE A A APEX DR benefits from documenting loads, device locations, and system interfaces clearly at the start, because clean coordination reduces downstream field questions and inspection friction.
Location: 320 5th Avenue West, Cochrane, AB
Date: 7/17/2023