Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: y 2 heat conventional heat detectors which were not replaced with addressable detectors at time of system upg
Problem/Objective: Complete of: y 2 heat conventional heat detectors which were not replaced with addressable detectors at time of system upg.
Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.
Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.
Reflection: MNA learned from Glenmore Estates that focused fire alarm verification at of: BLDG 1000 2120 Southland Drive SW for the depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: BLDG 1000 2120 Southland Drive SW
Date: 11/9/2022