
Description: MNA provided fire alarm verification and life-safety consulting for Delta Lodge Kananaskis North East wing 1st & 3rd floor FA upgrade based on the 2016 project folder evidence.
Problem/Objective: The client needed MNA to support Delta Lodge Kananaskis North East wing 1st & 3rd floor FA upgrade with documented engineering review, verification, or life-safety closeout tied to the available project records.
Method/Process: MNA reviewed the available folder documents (1612038DLK FAVC Delta Lodge Kananaskis 2&3 Floor FA.pdf; 1612038DLK FAVC Delta Lodge Kananaskis NE Wing 1&3 Floor FA upgrade.pdf; Delta Kananaskis – Info Dec 6 2016.pdf), identified the service scope, and prepared or supported the required engineering deliverable.
Result/Impact: Confirmed the fire alarm and life-safety scope was reviewed, tested, or documented so the client had a clearer basis for verification, inspection, or closeout.
Reflection: MNA learned from Delta Lodge Kananaskis North East wing 1st & 3rd floor FA upgrade that older project folders need clear source tracking so future reviews can separate confirmed engineering outcomes from incomplete or missing evidence.
Location: Kananaskis, AB T1W 2W3, Canada
Date: 12/1/2016