
Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: 5 additional H/S and Control Relay/Load Test
Problem/Objective: Complete of: 5 additional H/S and Control Relay/Load Test.
Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.
Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.
Reflection: MNA learned from Columbia Store Banff that focused fire alarm verification in a retail tenant space depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: 317 Banff Ave M9, Banff, AB T1L 1C1, Canada
Date: 12/1/2022