Cedars Villa Extendicare

Cedars Villa Extendicare

Description: Fire protection and sprinkler system engineering support based on project submittal documentation.

Problem/Objective: The project required practical engineering support for a group b, division 3, care occupancies without treatment while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Cedars Villa Extendicare that focused fire alarm verification at 20 heads The City of Calgary at 309B MacLeod Trail SW depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 20 heads The City of Calgary at 309B MacLeod Trail SW

Date: 10/13/2021

Scroll to Top