![[cancelled] Allure Hair Studio](https://i0.wp.com/allurehairstudio.ca/wp-content/uploads/2023/07/Untitled-1.png?w=750&ssl=1)
Description: [cancelled] Allure Hair Studio was a code and life-safety consulting assignment for ALL for a group a, division 2, assembly occupancies not elsewhere classified in group a in 2026 34 Ave. SW Calgary. The work focused on turning available project information into a clear, coordinated engineering deliverable that could support review, permitting, construction, or closeout needs.
Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.
Result/Impact: Prepared a documented engineering deliverable for the project scope, giving the client a clearer basis for review, construction, permit, or closeout decisions.
Reflection: MNA learned from [cancelled] Allure Hair Studio that assembly occupancies benefit from early checks on occupant load, device coverage, and inspection-ready documentation; the project reinforced the value of turning limited source information into clear decisions, coordinated documentation, and practical next steps for the client.
Location: 2026 34 Ave. SW Calgary
Date: 2019-09-01