Arbour Lake Condos

Arbour Lake Condos

Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: of: 2 new addressable ducts for north and south HVAC units

Problem/Objective: Complete of: 2 new addressable ducts for north and south HVAC units.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Arbour Lake Condos that focused fire alarm verification at of: 88 Arbour Lake Road for the depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 88 Arbour Lake Road

Date: 2/15/2023

Scroll to Top