Aladdin Daycare

Description: Fire alarm verification and code-compliance review based on project submittal documentation.

Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Aladdin Daycare that focused fire alarm verification at 2400 leaving each fire alarm zone. 4.4.1. Contact changes st depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 11807 Elbow Dr SW, Calgary, AB T2W 1H1, Canada

Date: 7/10/2024

Scroll to Top