Description: MNA provided engineering consulting for Westwind Corner Physiotheraphy based on the 2016 project folder evidence.
Problem/Objective: The client needed MNA to support Westwind Corner Physiotheraphy with documented engineering review, verification, or life-safety closeout tied to the available project records.
Method/Process: MNA reviewed the available folder documents (folder/project record only), identified the service scope, and prepared or supported the required engineering deliverable.
Result/Impact: Confirmed the fire alarm and life-safety scope was reviewed, tested, or documented so the client had a clearer basis for verification, inspection, or closeout.
Reflection: MNA learned from Westwind Corner Physiotheraphy that older project folders need clear source tracking so future reviews can separate confirmed engineering outcomes from incomplete or missing evidence.
Location: Bay 140, 3650 Westwinds Dr NE, Calgary, AB T3J 5K3, Canada
Date: 9/1/2016