
Description: H&M manufacture was a fire alarm consulting, and fire alarm verification assignment for THP for a group a, division 2, assembly occupancies not elsewhere classified in group a in T2C 3B8. The work focused on turning available project information into a clear, coordinated engineering deliverable that could support review, permitting, construction, or closeout needs.
Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.
Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.
Reflection: MNA learned from H&M manufacture that focused fire alarm verification at #50, 7350 110 AVE SE, CALGARY, AB, T2C 3B8 depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: #50, 7350 110 AVE SE, CALGARY, AB, T2C 3B8
Date: 8/5/2025