
Description: Cozart Chiller Replacement was a code and life-safety consulting assignment for DAV for a building project in the project site. The work focused on turning available project information into a clear, coordinated engineering deliverable that could support review, permitting, construction, or closeout needs.
Problem/Objective: The project required practical engineering support for a building project while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: MNA reviewed the project documents, identified the applicable service scope, coordinated the relevant discipline inputs, and prepared the deliverable around the confirmed building use, location, and project constraints.
Result/Impact: Delivered mechanical engineering review for the documented scope, supporting permit, construction, equipment coordination, or closeout requirements.
Reflection: MNA learned from Cozart Chiller Replacement that even small scopes benefit from making assumptions, site constraints, and compliance evidence explicit; the project reinforced the value of turning limited source information into clear decisions, coordinated documentation, and practical next steps for the client.
Location: 1001 14 Ave SW, Calgary, AB
Date: 3/1/2025