iPlace Phase 1

iPlace Phase 1

Description: Fire alarm verification and code-compliance review based on project submittal documentation.

Problem/Objective: The project required practical engineering support for a group c, residential occupancies while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from iPlace Phase 1 that focused fire alarm verification at 1 Industrial Place Canmore TTW 1Y1 depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 1 Industrial Place Canmore TTW 1Y1

Date: 3/11/2025

Scroll to Top