Description: Fire alarm verification and code-compliance review based on project submittal documentation.
Problem/Objective: The project required practical engineering support for a group b, division 3, care occupancies without treatment while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.
Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.
Reflection: MNA learned from Village Square Leisure Center that focused fire alarm verification at 12623 56 St NE Calgary T1Y5)1 depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: 12623 56 St NE Calgary T1Y5)1
Date: 12/26/2024