Trinity Hills Pet Hospital

Trinity Hills Pet Hospital

Description: Fire alarm verification and code-compliance review based on project submittal documentation.

Problem/Objective: The project required practical engineering support for a group b, division 2, care or treatment occupancies while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from Trinity Hills Pet Hospital that focused fire alarm verification at 240 Na’a Plaza SW Calgary T3H 6A4 depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.

Location: 240 Na’a Plaza SW Calgary T3H 6A4

Date: 5/29/2024

Scroll to Top