LaFarge Exshaw BW2 MCC1 MCC2

LaFarge Exshaw BW2 MCC1 MCC2

Description: Fire alarm verification and code-compliance review based on project submittal documentation.

Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.

Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.

Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.

Reflection: MNA learned from LaFarge Exshaw BW2 MCC1 MCC2 that industrial MCC/control work benefits from clear equipment naming, plant-location evidence, and disciplined coordination so review and closeout records remain traceable.

Location: AB-1A, Exshaw, AB T0L 2C0, Canada

Date: 2/1/2023

Scroll to Top