Description: Fire alarm verification and code-compliance review based on project submittal documentation. Scope noted in source: , schedule and other limitations stated in the document and in the contract between
Problem/Objective: Complete , schedule and other limitations stated in the document and in the contract between.
Method/Process: Reviewed available project drawings and submittal documentation to determine the project scope and supporting evidence.
Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.
Reflection: MNA learned from Fire & Life Safety Assessment that focused fire alarm verification at 500 4th Avenue SW, Suite 2500, Calgary depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: 500 4th Avenue SW, Suite 2500, Calgary
Date: 5/1/2021