![[cancelled] East Calgary Landfill](https://www.calgary.ca/waste/drop-off/landfill-guidelines-and-faq/_jcr_content/root/maincontentpar/responsivegrid/grid_layout/column-c838323a-ea7b-44b1-9fa8-7db44552cded0/grid_layout/column-b0c8851f-f06b-48d3-b54a-4f3d3077de0e0/image.img.85.1280.jpeg/1659538733546/east-calgary-scalehouse-2014-020.jpeg)
Description: Fire alarm verification and code-compliance review based on project submittal documentation.
Problem/Objective: The project required practical engineering support for a group a, division 2, assembly occupancies not elsewhere classified in group a while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.
Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.
Reflection: MNA learned from [cancelled] East Calgary Landfill that focused fire alarm verification at 4444 Builders Road SE Calgary depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: 4444 Builders Road SE Calgary
Date: 2019-11-01