Description: Fire protection and sprinkler system engineering support based on project submittal documentation.
Problem/Objective: The project required practical engineering support for a group c, residential occupancies while keeping the scope aligned with the available drawings, site information, and code or authority requirements.
Method/Process: Reviewed project documentation and verified the fire alarm system against applicable CAN/ULC-S537 and Alberta Building Code requirements.
Result/Impact: Confirmed the fire alarm system was tested and operational at the time of verification, with the required CAN/ULC-S537 verification record issued for the project.
Reflection: MNA learned from 334 14 Ave SW that focused fire alarm verification at 334 14 AVENUE SW, CALGARY depends on disciplined device-by-device evidence, clear drawing/submittal tracking, and early coordination with the client or AHJ so compliance can be closed without avoidable rework.
Location: 334 14 AVENUE SW, CALGARY
Date: 3/26/2026